English Español
Language:English
Wear Resistant Steel
  • Wear Resistant Cylinder Sleeve-9Cr18Mo
  • Wear Resistant Cylinder Sleeve-9Cr18Mo
  • Wear Resistant Cylinder Sleeve-9Cr18Mo
  • Wear Resistant Cylinder Sleeve-9Cr18Mo

Wear Resistant Cylinder Sleeve-9Cr18Mo

  • Description:
  • Size:According to customer drawing   Materials: 17-4PH, 9Cr18Mo, Cr25MoV, Cr12MoV,SCH13, KMTBCr26, 1.4848, HK, HU            
    Finished: Centrifugal Casting, Machining                        

  • Contact Now
  • Description
  • Packing
  • FAQ
  • Product Range Wear Resistant Steel Bushing, Wear Risistant Pipe, Sleeve,Cylinder
    Size: According to customer drawing
    Materials: 17-4PH, 9Cr18Mo, Cr25MoV, Cr12MoV,SCH13, KMTBCr26, 1.4848, HK, HU
    Finished: Centrifugal Casting, Machining
    Packing : Rust Protection, Wooden Case, suitable for seafreight and airfreight
    Machine Equipement: Lathe,Baking Furnace for Shell Mold, Intermediate Frequency Melting Furnace,Centrifugal Casting Machinery, Saw Machiner, Milling Machinery
    Inspection Equipment: Spectrometer, Tensile testing machinery, hardness tester, Ultrasonic Tester, Hydraulic Press
    Application: Power Plant, Mechanical Equipment
    Market: Southeast Asia, Europe, South America, Middle East
    Supply Capacity: 200 tons/Month
    Minimum Qty: 500KG
    Term of Trade: FOB, CIF, CFS, Ex Work, DDU
    Payment Term: T/T, L/C
  • Rust Protection, Wooden Case, suitable for seafreight and airfreight

     


  • 1.Where is coutry origin of raw materials to be used?
    All the raw materials is from Chinese famous steel manufacturer, Raw materials Quality is stable and guaranteed.


    2.Did you arrange inspection for raw materials before producing?
     Our QC will arrange inspection before producing for all the raw materials, including chemical, dimension, physical property


    3.How do you control the quality during producing process?
    During producing process, QC Person make inspection such as dimension, hardness, UT test, MT test in each stage.


    4.What certificate do you supply after finished production?
    Mill test Report, EN10204 3.1 certificate, all the documents and pictures for inspection process


    5.How do you keep the traceability for each batch goods?
    All the casting No., heat number will be uniqueness, QC keep all the documents is clearly, all the record report keep 10 years even more.


    6.How will you do when finding the unqualified goods?
    QC will make report timely, the rectification opinion will be convey to production department. Meantimes, sales and coordinator keep attention for process. The purpose is keep all the cargo quality is passed.


    7.How do you control the delivery?
    Winrock have own trucks, could delivery cargo to any port warehouse in China according to customer requirement. Meantimes, we cooperate with well-known freight forwarder, who have strong delivery and clearance Custom capability. That will keep the clearance smoothly and freight more safety.

return